30MW Power Plant (12×2.5MW) generators
Jun 22nd, 2008 | By zubair | Category: Power PlantPower Plant Description:
1- (12) Housed, 2.500 Megawatt Diesel Driven Generator Sets, with GM/EMD Model No. 20/645/E4 remanufactured diesel engines containing new and remanufactured sub-assembly components only, steel skids, and remanufactured EMD “brushless type” late model generators.
2- Complete set of Engine/Generator controls for the above 30 megawatts of power.
3- Complete set of switchgear for the 30 megawatts of power including 12 generator breakers and two main breakers installed into a control
i) Complete set of automation controls of the power plant.
ii) Complete power plant controls equipment (redundant electronic Siemens- Woodward)
iii) Monitoring equipment with multi distribution control and metering capabilities.
iv) Complete power plant control systems for two 12.5 MW paralleling plants.
v) Battery banks and charging systems.
4- Oil cooling and filtration equipment for each engine.
5- Steel sound attenuated houses, induce fan ventilated
6- Exhaust transition system with silencers, heat insulated.
7- Remote mount radiators, Young Radiators w/ upgrade kit & 75 HP motors and fans kit.
8- Engine/generator control panels with 5KV circuit breakers for each GENSET
9- Complete computer with software for control and monitoring.
10- Lot of fuel and water piping
11- (2) Main breakers to 69KV distribution.
12- (2) Load break switches 5 KV
13- (1) Air compressor station 2 X 125 psig.
14- (2) Impedance matched 15MVA, 4160/69KV station transformers.
15- 30 MVA spare transformer 4160/69kv/138kv.
16- 69Kv take tower and necessary protections and hardware.
17- Modular style air conditioned control house
18- Set of electrical and mechanical spare parts
19- Set of electrical and mechanical tools
20- (2) 20,000 gls day tanks
21- (1) Main Storage tank of 6,000 barrels (252,000 gls.)
22- (1) Main Storage tank 15,000 barrels (630,000 gls.)
23- (1) New oil storage tank of 238 barrels (10,000 gls.)
24- (1) Used oil storage tank of 95 barrels (4,000 gls.)
25- Fuel filter and fuel lines from main tanks to day tanks.
26- (2) 600 gpm fuel transferring pumps.
27- (1) Steel Trailer with guard office, bathrooms and changing rooms
28- (1) Steel Office trailer, complete, with AC, Bathroom. Conf. room and two offices.
29- (2) Steel trailer prepared for spare parts, and tollroom
|
Operation |
Operation |
Operation |
|
|
Total Hours |
Total Hours |
Total Hours |
|
|
|
After Overhaul |
Since last Oil Change |
|
|
11,762.70 |
2,936.19 |
82.90 |
|
|
11,731.12 |
104.61 |
6.28 |
|
|
11,297.00 |
1,711.63 |
142.88 |
|
|
9,557.00 |
1,886.22 |
1,214.76 |
|
|
6,350.00 |
|
|
|
|
14,862.74 |
3,272.55 |
3,272.55 |
|
|
12,551.77 |
3,019.75 |
128.68 |
|
|
7,241.93 |
|
753.49 |
|
|
10,855.64 |
2,399.28 |
135.81 |
|
|
5,883.11 |
|
2,156.13 |
|
|
11,212.24 |
3,128.91 |
1,074.91 |
|
|
9,717.37 |
1,572.61 |
1,243.98 |
|